Elk Island Catholic Schools

Sherwood Park, AB

 
 
 

Project Description

Size: 3310 m2  (35,600 ft2)

Budget: $9.4 Million

Location: Sherwood Park, AB

The Elk Island Catholic School Board building includes a two story office building and a seven bay shop which houses the district’s bus fleet and provides a facility for bus and school maintenance.

The School Board required an open concept floor plan for the office component to foster communication among employees but also wanted a portion of the space dedicated to breakout spaces for quiet, distraction free work. The design reflects these conflicting needs by providing multiple social hubs throughout the building and multiple breakout rooms with acoustic treatments to offset the need for closed offices.

The light-filled lunchroom on the main floor has become the heart of the building; this non-traditional space is the combination of an eating area, collaboration space, social hub, and a means to increase employee interaction. The building also incorporates a timeless material palette; the brickwork on the interior is a subtle reminder of schoolhouses from years past.

【产后丰胸方法】所以,宝妈们不用担心酒酿蛋丰胸产品,我们产后丰胸是有很多方法的。爱美的你们,可以多多去寻找适合自己的方法的哦丰胸产品。但是,产后丰胸的方法肯定有很多,只是要去坚持哦丰胸方法,希望每位爱美的宝妈都有一个健康,美丽的身体产后丰胸!